Do I need approval for a new driveway or verge crossing?
Yes. If your dual occupancy requires a new driveway or a change to an existing driveway or verge crossing, separate driveway approval may be required.
ACT Government requires driveway approval to:
- construct a new driveway; or
- change the location, dimensions, layout or material of an existing driveway.
A second driveway and kerb crossing may also be permitted to service an additional approved dwelling, subject to the applicable safety, access and design requirements.
Importantly, having stamped Building Approval drawings does not automatically mean the driveway is approved.
Reference: ACT Government – City Services, Domestic Driveways; MIS 07 Driveways – https://www.cityservices.act.gov.au/plan-and-build/building-works/driveway-applications
Short Answer
Yes. A new driveway or changes to an existing driveway/verge crossing generally require driveway approval. A second driveway may be permitted for an additional approved dwelling, subject to the applicable requirements.
Detailed Explanation
Yes. A new or modified driveway associated with a dual occupancy may require separate approval for works affecting the driveway and Territory-owned verge.
Driveway approval is required for the construction of a new driveway or changes to the location, dimensions, layout or material of an existing driveway. A second driveway or kerb crossing may be considered where it services an additional approved dwelling, subject to the applicable planning, engineering, safety and municipal infrastructure requirements.
Works on the verge or other unleased Territory land also require the relevant approval before works commence.
No minimum block size does not remove the need for planning assessment.