My block is a large block. Did my front setback change?
Yes,
The 2026 Technical Specifications changed how front setbacks are applied by removing separate lower and upper floor setback requirements and introducing a single dwelling setback requirement. The exact change depends on the applicable table, subdivision approval date, and type of frontage.
- Table 1 (corner blocks – secondary street frontage): Under the 2025 specifications, a large block required a 4 m setback for the lower floor and 6 m for the upper floor to the secondary street frontage. The 2026 specifications remove this distinction and require a single 4 m setback for the dwelling, regardless of storeys. The 6 m garage or carport setback remains unchanged.
- Table 2 (subdivisions approved on or after 18 October 1993 but before 31 March 2008): Under the 2025 specifications, a large block required 4 m for the lower floor and 6 m for the upper floor for both the primary front boundary and secondary street frontage. The 2026 specifications replace this with a single dwelling setback of 4 m for both the primary front boundary and secondary street frontage. Garage and carport setbacks remain unchanged at 5.5 m.
- Table 3 (subdivisions approved on or after 31 March 2008): Under the 2025 specifications, a large block required 4 m for the lower floor and 6 m for the upper floor to the primary front boundary. The secondary street frontage setback remained 3 m, and the public open space or pedestrian path setback remained 4 m. Under the 2026 specifications, these are replaced with a single dwelling setback of 4 m to the primary front boundary, 3 m to the secondary street frontage, and 4 m to public open space or pedestrian paths wider than 6 m, regardless of storeys. Garage and carport setbacks remain unchanged.
- Table 4 (Multi-unit housing front boundary setbacks): Under the 2025 Technical Specifications, front setback requirements were separated into lower floor and upper floor levels. For subdivisions approved on or after 18 October 1993, the primary front boundary setback was 4 m for lower floors and 6 m for upper floors, with garages and carports set back 5.5 m (including at least 1.5 m behind the front building line). Older subdivisions required a 6 m setback. Secondary street frontage and pedestrian path/public open space setbacks also varied depending on the frontage type and block size.
Under the 2026 Technical Specifications, these requirements are simplified by removing the lower and upper floor distinction. A single dwelling setback now applies:
- Primary front boundary: 4 m for subdivisions approved on or after 18 October 1993, and 6 m for earlier subdivisions.
- Secondary street frontage: 2 m for corner blocks.
- Pedestrian paths up to 6 m wide: 3 m.
- Public open space or pedestrian paths wider than 6 m: 4 m.
- Garage and carport setbacks remain unchanged, including the 5.5 m setback for newer subdivisions and the applicable setbacks for other frontage types.
The updated requirements should be checked against the relevant front boundary setback table in the Planning (Residential Zones) Technical Specifications 2026, as the applicable requirement depends on the block circumstances.
Reference: Planning (Residential Zones) Technical Specifications 2026 (NI2026-303), Assessment Outcome 14.5- Planning (Residential Zones) Technical Specifications 2026
Short Answer
Yes, front setback requirements have changed under the 2026 Technical Specifications. The changes generally relate to how front setbacks are structured, including the removal of separate lower and upper floor setback requirements and the introduction of a single dwelling setback requirement in the relevant tables. This means that some two-storey dwellings may have different setback requirements compared with the 2025 specifications.
Detailed Explanation
Yes, Table 1: if your property is a corner block and you were planning a second storey. Under the 2025 Technical Specifications, the table for front boundary setback to a secondary street frontage required a 4 m setback for the lower floor and a 6 m setback for the upper floor on a large block. The 2026 Technical Specifications remove the separate lower and upper floor requirements, requiring a single 4 m setback for the dwelling to the secondary street frontage, regardless of the number of storeys. The 6 m setback for a garage or carport facing the secondary street remains unchanged. Yes, Table 2: if your property is in a subdivision approved on or after 18 October 1993 but before 31 March 2008 and you were planning a second storey. Under the 2025 Technical Specifications, Table 2 required separate lower and upper floor setbacks, with a large block requiring 4 m for the lower floor and 6 m for the upper floor for both the primary front boundary and secondary street frontage. Under the 2026 Technical Specifications, this distinction has been removed. A single dwelling setback now applies, requiring 4 m for both the primary front boundary and secondary street frontage, regardless of storeys. Garage and carport setbacks remain unchanged at 5.5 m. Yes, Table 3: if your property is in a subdivision approved on or after 31 March 2008 and you were planning a second storey. Under the 2025 Technical Specifications, Table 3 required separate lower and upper floor setbacks, with a large block requiring a 4 m setback for the lower floor and 6 m setback for the upper floor to the primary front boundary. The front boundary setback to a secondary street frontage remained 3 m, and the front boundary setback to public open space or pedestrian paths wider than 6 m remained 4 m for both floor levels. Under the 2026 Technical Specifications, this distinction has been removed. A single dwelling setback now applies, requiring for a large block:- 4 m to the primary front boundary;
- 3 m to a secondary street frontage; and
- 4 m to public open space or pedestrian paths wider than 6 m,
No minimum block size does not remove the need for planning assessment.
Would you like to know what these rules mean for your property?
Get a Planning Assessment prepared by our experienced planning team.